Investing in growth

Dental practice expansion calculator

Test the cash flow before funding the project.

Hypothetical example Every figure here is an example you can edit. None of it is a lender offer, a market average or a customer result.

Your assumptions

The project
Changes the labels and the questions below. It does not change any arithmetic or introduce project-specific benchmarks.
Equipment, buildout and the initial additional cash the project needs. No financing costs are embedded.
USD
What the project adds
Additional collections once the project matures, not total practice collections.
USD
% per year
Every additional fixed cost the project causes, including all additional clinical and administrative labour and any additional owner work. Do not include existing overhead that does not actually change.
USD
USD
Ramp and horizon
% per year
% per year
Later years reuse this figure. Fixed costs and maintenance capital are incurred in full from year one and are not quietly ramped down with revenue.
% per year
years
% per year
Proposed financing
Zero is supported. Financing never changes the project's unlevered NPV, only the cash you put in and the cash left after payments.
USD
% per year
Fixed rate, fully amortizing.
months

Printing and copying include the numbers you entered.

Live calculation needs JavaScript. The worked example below, the method and every explanation are part of this page and remain readable without it.

Modeled project net present value over 5 years-$85,580.03Negative under your assumptions, at a 10.0% discount rate. Financing is deliberately excluded from this figure: a loan changes when you pay, not whether the project earns its cost.
Mature-year project cash flow$80,000.00Additional collections at full ramp, less variable costs, incremental fixed costs and additional maintenance capital. Before any loan payments.
Year-one cash after debt service-$72,522.88The ramp year the project actually has to survive, with the loan payment included.
Mature-year cash after debt service$32,477.12Mature-year project cash flow less the first-year scheduled loan payments.
Additional collections needed to break even$253,604.11Enough to cover incremental fixed costs, maintenance capital and scheduled debt service at a 30% variable cost share. Compare it with the $300,000 you assumed.
Simple payback on the upfront investmentNot applicableThe project does not recover the initial investment within the 5-year horizon. It is still short by about $7,500 of cumulative cash at the end of the horizon. No payback is extrapolated from a mature year's profit.
Initial owner cash$50,000Upfront investment of $250,000 less the $200,000 proposed loan.
Return on owner cash at full ramp64.95%Year 3 cash after debt service of $32,477.12 divided by initial owner cash.
Downside net present value-$217,024.48The same project with additional collections 20% below your assumption, with fixed costs unchanged.
  • A positive mature-year cash flow does not guarantee a positive project NPV. The ramp years, the size of the upfront investment and the discount rate all count against it.
Year-by-year project cash flow for a practice expansion. Project cash flow excludes financing; the last two columns add the loan back so you can see the cash position as well as the project merit.
YearRampAdditional collectionsVariable costsIncremental fixed costsMaintenance capitalProject cash flowDiscountedCumulative project cashLoan paymentsCash after debt service
Year 150%$150,000$45,000.00$120,000.00$10,000.00-$25,000.00-$22,727.27-$25,000.00$47,522.88-$72,522.88
Year 275%$225,000$67,500.00$120,000.00$10,000.00$27,500.00$22,727.27$2,500.00$47,522.88-$20,022.88
Year 3100%$300,000$90,000.00$120,000.00$10,000.00$80,000.00$60,105.18$82,500.00$47,522.88$32,477.12
Year 4100%$300,000$90,000.00$120,000.00$10,000.00$80,000.00$54,641.08$162,500.00$47,522.88$32,477.12
Year 5100%$300,000$90,000.00$120,000.00$10,000.00$80,000.00$49,673.71$242,500.00$47,522.88$32,477.12
Totals$1,275,000$242,500$164,420$237,614$4,886
Project cash flow by year, with and without the loan
Grouped bars by year showing project cash flow before financing and cash after debt service. Negative ramp-year values are drawn below the zero line.-$80,000-$40,000$0$40,000$80,000-$25,000-$72,523Yr 1$27,500-$20,023Yr 2$80,000$32,477Yr 3$80,000$32,477Yr 4$80,000$32,477Yr 5
  • Project cash flow (before financing)
  • Cash after debt service
Show the annual cash flows as a table
The same annual cash flows as a table.
YearProject cash flowCash after debt service
Year 1-$25,000.00-$72,522.88
Year 2$27,500.00-$20,022.88
Year 3$80,000.00$32,477.12
Year 4$80,000.00$32,477.12
Year 5$80,000.00$32,477.12
Cumulative position against the upfront investment
Line showing cumulative project cash flow net of the $250,000 upfront investment. The line crosses zero at the simple payback point, if it does so within the horizon.-$300,000-$225,000-$150,000-$74,999$1StartYr 1Yr 2Yr 3Yr 4Yr 5Year
  • Cumulative project cash versus the upfront investment
Show the cumulative position as a table
Cumulative project cash net of the upfront investment, as a table.
PointCumulative position
Start-$250,000.00
Year 1-$275,000.00
Year 2-$247,500.00
Year 3-$167,500.00
Year 4-$87,500.00
Year 5-$7,500.00
Downside case: additional collections 20% lower than you assumed, with incremental fixed costs and maintenance capital unchanged. This is the case most worth stress-testing, because fixed costs do not fall when volume does.
YearAdditional collectionsProject cash flowCash after debt service
Year 1$120,000-$46,000.00-$93,522.88
Year 2$180,000-$4,000.00-$51,522.88
Year 3$240,000$38,000.00-$9,522.88
Year 4$240,000$38,000.00-$9,522.88
Year 5$240,000$38,000.00-$9,522.88
Downside net present value-$217,024.48

How to read this model

  • Net present value here is deliberately unlevered. Borrowing changes the timing of the cash you pay, not whether the project earns more than its cost of capital, so adding the loan to the NPV would flatter a weak project.
  • The ramp assumption does most of the work in the early years. A project that is fine at full maturity can still be painful in year one, which is where the cash-after-debt column matters more than the NPV.
  • Additional collections, ramp and cost assumptions are yours. Nothing here is a forecast of your production, a benchmark, a lender decision or an equipment quote.
  • Section 179 and bonus depreciation, sales and use tax, and the difference between a loan and a lease for tax purposes can change the answer materially and are not modeled. Ask your CPA before relying on any of this.

Explore financing for your expansion.

Tell us what you are financing. Most requests reviewed within 2 business hours.

Useful next

How this calculator works

project_cash[t] = steady_state_additional_collections*ramp[t]*(1 - variable_cost_share)
  - incremental_fixed_cash_costs - maintenance_capital

project_NPV = -initial_investment + SUM(project_cash[t]/(1+discount)^t)

initial_owner_cash        = initial_investment - proposed_loan
owner_cash_after_debt[t]  = project_cash[t] - scheduled_loan_payments_in_year[t]

The project and its financing are two separate questions

Project NPV is unlevered on purpose: loan proceeds are never added to it. Borrowing the whole investment does not make a bad project good; it changes who supplies the cash and when it comes back. Change the loan amount and watch the NPV stay exactly where it was. Borrowing more than the initial investment is treated as an inconsistent-funding condition, not as an infinite return.

Break-even additional collections

The break-even figure divides the recurring cash costs you entered plus the scheduled annual debt service by 1 - variable_cost_share, because only the contribution margin on additional collections is available to cover fixed costs and payments. It assumes those fixed costs really do stay fixed across the range, which is often false at the point where you need another team member or another hygiene day.

Payback

Payback is computed from cumulative unlevered project cash after the initial investment, including the negative early ramp years, and interpolated inside the first year where the cumulative total actually crosses zero. If it never crosses inside the horizon, the tool says so. It does not extrapolate a payback period from a mature-year profit figure, because that would answer a question nobody asked.

A positive mature-year cash flow does not guarantee a positive project NPV. The default example shows exactly that: the mature years are comfortably positive and the five-year NPV is still negative, because the ramp years and the discount rate matter.

What the model assumes away

  • No terminal business value and no exit multiple on the additional earnings.
  • No equipment resale or salvage value at the end of the horizon.
  • No recovery of the initial cash outlay or of any working capital inside it.
  • No tax effects at all. Section 179, bonus depreciation, MACRS and interest deductibility are all outside the model, and they can change a real decision.
  • No cannibalisation of existing production, unless you enter the additional collections net of it.
  • No change in the existing practice's economics beyond the incremental costs you entered.

The assumption that actually decides this

Everything here depends on the additional collections figure, and that figure needs evidence: unmet demand you can point to, chair time or hygiene capacity that is genuinely constrained today, a referral pattern that would change, or procedures currently being referred out. Equipment does not create patients, and a fourth operatory does not fill itself. If the additional collections are a hope rather than a forecast you can defend, the NPV is arithmetic performed on a hope.

A second location adds one more thing the model cannot capture: management capacity. Another location can consume cash and attention for years while the first location remains profitable, and that is a common way a profitable practice gets into trouble.

Questions to answer before funding this

  • Where specifically do the additional collections come from, and what evidence supports the number?
  • Is the constraint really capacity, or is it new-patient flow? Only one of those is solved by buildout.
  • Who does the additional clinical work, and is their compensation in the incremental fixed costs?
  • How long is the disruption during construction or installation, and what does it cost in lost production?
  • What training and downtime does new technology need before it produces anything?
  • What is the useful life of what you are buying, and what happens at the end of it?
  • If the ramp is half as fast as assumed, can the practice still service the debt?